Home » References

References

Selected horizontal directional drilling projects: long routes, hard rock and crossings under roads and rivers.

References

Projects that impress below the surface.

Long routes, hard rock, roads and rivers that must not be closed: our references show how we solve demanding crossings trenchless.

Typical tasks

River and waterway crossings

Motorway and road crossings

Drilling in rock

Forests and protected areas

Underground cable routes

Selected projects

Projects in detail

Krafteam HDD-Anlage Baustelle

Aalbach – longest bore with fluid losses

A main road, 652 metres and fluid losses in almost every drilling phase: in Aalbach, we showed that precision work is possible even under difficult conditions.

View project →

Krafteam Logo

Biotope – HDD Drilling Under Main Road

530 meters beneath a busy main road: In Biotope, we pulled in three pressure-resistant HDPE pipes through demanding rock formations—overcoming a 27-meter elevation difference.

View project →

Krafteam Logo

Ehrenforst – Longest HDD Bore Using Double Rod System

565 meters through dense forest, 40 meters beneath the surface: In Ehrenforst, we achieved our longest rock drill to date using the Double Rod System—a brand new milestone for our team.

View project →

Krafteam Logo

A7 – Motorway HDD Crossing

Without disrupting traffic, we completed a 230-meter HDD crossing under the A7 motorway. A compact yet technically challenging trenchless installation executed through limestone, marl, and claystone formations.

View project →

Krafteam Logo

Mönchbusch – Horizontal Directional Drilling in Forest Terrain

Hard-to-access forest ground, solid rock formation of limestone and marl: In Mönchbusch, we successfully completed a technically challenging 330-meter HDD bore installing three product conduits.

View project →

HDD-Bohrung von Krafteam für das SuedLink-Projekt

Successful horizontal bore for SuedLink under road and river

Three bores of around 650 metres each through heavily fractured rock: for the major SuedLink project, we crossed beneath a federal road and a river, going where others do not want to dig.

View project →

FAQ

Questions about projects

What projects does Krafteam carry out?

Mainly trenchless crossings by horizontal directional drilling: under roads, motorways, rivers, railways and protected areas, for underground cables and gas, water and fibre-optic lines.

How long can a single bore be?

With our large-scale drilling, we deliver routes of over 1 km. The possible length depends on ground conditions, pipe diameter and elevation profile.

Bohrt Krafteam auch in Fels?

Yes. For limestone, marl and solid rock, we use rock-drilling technology and a dual-rod system. Find out more under rock drilling.

Can I get references for my tender?

Yes. On request, we compile reference lists and project descriptions for your tender documents. Write to us via the contact form.

Contact

Let’s talk.

Do you have a specific construction project or questions about our services and what is feasible? We look forward to hearing from you.

Address

Krafteam GmbH
Otto-Hahn-Straße 52, 48529 Nordhorn, Germany