Home » Services » Horizontal Directional Drilling (HDD)

Horizontal Directional Drilling (HDD)

Steered horizontal bores for power, gas, water, district heating and fibre optics: from house connections to underground cable routes over a kilometre long, without digging.

HDD · Trenchless utility construction

Horizontal directional drilling: laying lines without digging

With steered horizontal directional drilling (HDD), we lay pipes and cables beneath roads, rivers, railways and protected areas. Instead of an open trench, all it takes is an entry pit and an exit pit; the line between them is built entirely underground.

From a short house connection to an underground cable route more than a kilometre long: with compact and heavy rigs, rock-drilling technology and our own drilling fluid recycling, we choose the right method for every route.

Request a project
Recyclinganlage für die Horizontalbohrtechnik im Einsatz auf HDD-Baustelle

Our methods

The right HDD method for every route

Which method is economical depends on bore length, pipe diameter and ground. We assess this section by section.

Compact drilling

Compact rigs up to 32 t for fibre optics, house connections and urban crossings, up to around 400 m.

Large-scale drilling

Heavy rigs up to 330 t for underground cable routes, transmission pipelines and bore lengths over 1 km, up to DN 1400.

HDD method

Steered fluid-assisted drilling with bentonite: pilot bore, reaming and pipe pullback in one controlled process.

Rock drilling

Rock-drilling technology for solid rock and mixed ground, where standard drill heads reach their limits.

Soil displacement

Soil displacement hammer for short house connections and crossings without drilling fluid.

Project planning and documentation

Route planning, drilling logs and as-built documentation for every bore.

How it works

How horizontal drilling works

Between the entry and exit pits, the line is built in four steps, entirely underground.

01

Planning and analysis

The route, soil survey and existing utilities are recorded and the bore is planned precisely.

02

Pilot bore

The drill head is steered along the planned route and tracked for position and depth in real time.

03

Reaming

The pilot hole is gradually enlarged to the required diameter. The drilling fluid supports the borehole and carries out the cuttings.

04

Pulling in the line

The pre-assembled pipe is pulled in in a single operation, with low stress and no damage to the surface.

Applications

Which lines we lay trenchless

Water and sewage

Drinking water, sewage and stormwater pressure pipes made of ductile iron, steel or PE, including large nominal sizes.

Gas and biogas

High- and low-pressure gas pipelines in line with the relevant standards such as DVGW GW 302. We are a DVGW-certified specialist company under GW 302-1.

Fibre optics and telecommunications

Duct bundles and fibre-optic cables for faster broadband roll-out.

Power and extra-high voltage

Casing pipes for underground and extra-high-voltage cables, from distribution level to transmission grid routes.

District heating and geothermal

District heating pipes as well as probes and lines for ground-coupled heating and cooling systems.

Crossings

Crossing beneath rivers, motorways, railways and protected areas without disturbing the surface.

Benefits

Why build trenchless

Environmental protection

Less ground disturbance, less excavation and a smaller CO₂ footprint than an open trench.

Cost efficiency

No extensive earthworks and hardly any surface reinstatement.

Time savings

Fast installation, even beneath obstacles where a trench would take weeks.

Safety

No deep open trenches along the route, so it is safer for the team and passers-by.

FAQ

Questions about horizontal drilling

What is horizontal directional drilling (HDD)?

HDD (horizontal directional drilling) is a steered drilling method for laying pipes and cables underground. Between an entry pit and an exit pit, a pilot bore is steered, reamed and the line pulled in, without a continuous trench.

When is HDD better than an open trench?

Above all for crossings of roads, waterways and railways, in protected areas and in urban areas where surface reinstatement is expensive. Across open land, an open trench can be cheaper. We compare both for each section.

How long and how large can a horizontal bore be?

With compact drilling, routes of up to around 400 m and DN 500 are typical; with large-scale drilling, over 1 km and up to DN 1400. Geology and route alignment are decisive.

Do you also drill in rock?

Yes. With rock-drilling rigs and interchangeable drill heads, we drill in solid rock and mixed ground.

How much does an HDD bore cost?

That depends on bore length, diameter, ground and site access. We price every project individually. Send us the route, length and pipe size for an initial assessment.

Contact

Let’s talk.

Do you have a specific construction project or questions about our services and what is feasible? We look forward to hearing from you.

Address

Krafteam GmbH
Otto-Hahn-Straße 52, 48529 Nordhorn, Germany